This page has been translated automatically. There may therefore be deviations or inaccuracies in the text. Legal claims are excluded.

Non-public charging infrastructure

Development of non-public charging infrastructure

In progress

The initiative was funded as part of the EU ZENAPA project.

Photo gallery


Facts and figures

  • New charging infrastructure for company vehicles
  • Operates on 100% green electricity
  • Significant reduction in CO₂ emissions by switching from vehicles with internal combustion engines to electric vehicles powered by green electricity


Overview

Duration: 2016–2026 (installation of charging points in 2025)

Funding reference number: ZENAPA - LIFE15 IPC/EN/000005

Funding body: European Union, LIFE Programme

Logo ZENAPA (Zero Emission Nature Protection Areas) funded by life