Roof renovation GemS HOM I

Renovation of roof of main building GemS Homburg I

The leaky flat roof of the "Robert-Bosch-Schule" comprehensive school in Homburg underwent energy-efficiency refurbishment between 2024 and 2026.

A PV system was also installed.

The next steps are to renovate the windows and façades of the building.

A refurbishment roadmap for the building was drawn up in advance.


Facts and figures

  • Complete energy-efficient refurbishment of the roof
  • 1 new roof construction
  • Reduction of the primary energy requirement by >30%
  • Reduction ofCO2 emissions by 21.6 tonnes per year


Overview

Duration: 2024–2026

Grantor:

This measure was funded by the Federal Ministry of Economics and Climate Protection (BMWK) as part of the Federal Funding Programme for Efficient Buildings (BEG).

Logo of the Federal Ministry for Economic Affairs and Climate Protection










and funded by the Saarland Ministry of the Interior, Building and Sport (MIBS) as part of the BAUSTEIN school construction programme.

Logo for the Ministry of the Interior, Building and Sport






Press event Handover of BAUSTEIN funding
Handover of the authorisation notice