Mandelbachtal Community School

Mandelbachtal-Schmelzerwald Community School , Ommersheim

A new multi-storey school extension is currently being planned at the site.

Link to the school



Information on our major construction projects at the school

  • Construction of a new school extension at the Mandelbachtal-Schmelzerwald community school, Ommersheim

    The new school building provides space for the rooms listed below:

    Level 0:

    • Learning cluster consisting of three classrooms, a differentiation room and an open learning landscape with access to the accessible roof area

    Level -1:

    • Learning cluster consisting of three classrooms, a differentiation room and an open learning landscape with access to the accessible roof area, a teaching kitchen with dining room, PC room

    Level -2:

    • Learning cluster consisting of three classrooms, differentiation room and an open learning landscape, team room, WC areas, storage and technical room

    Level -3:

    • Covered schoolyard area (outdoor area)

    Construction volume: approx. 12,509 cbm New school building

    Gross floor area: approx. 2,747 square metres New school building

    Energetic measures:

    • Extensively greened roofs (in some areas)
    • Curtain wall façade with 20 cm mineral wool insulation, rear ventilation and façade panels
    • Triple-glazed window façade with solar control glass
    • External shading of the windows
    • Heat generation system: Heat pump
    • Equipping the building with a central ventilation system
    • Rainwater utilisation for WC facilities and outdoor areas
    • Photovoltaic system on the flat roof (approx. 46 kWpeak)

    Accessibility:

    The new building will be barrier-free. The installation of a passenger lift to ensure accessibility to all rooms of the school extension for people with walking disabilities is planned.

    In addition, a disabled toilet will be installed next to the sanitary facilities.

    Year of execution and completion:

    Anticipated start of the measure: spring 2026
    Anticipated completion of the measure: spring 2029