BBZ St. Ingbert

BBZ St. Ingbert

Since autumn 2024, the so-called F-Bau has been available to the BBZ St. Ingbert after a complete renovation. Before the refurbishment began, the former Schmelzerwaldschule was part of the Gemeinschaftsschule I.

Link to the school


Information on our major construction projects at the school

  • F-Building of the BBZ St. Ingbert

    The F-building of the BBZ St. Ingbert consists of the so-called longitudinal and transverse building.

    BRI rd. 18.500 cbm
    GFA approx. 3,900 square metres

    Year of construction approx. 1964, reinforced concrete skeleton/solid construction with flat roof

    The cost-effective and sustainable complete refurbishment not only fulfils the fire protection requirements, but also creates a building that is state-of-the-art in terms of technology, energy and teaching. The existing building fabric was also upgraded through the necessary concrete refurbishment. By upgrading the energy efficiency of the building envelope and optimising the building technology, the annual energy costs were minimised.

    The new school building accommodates a total of 10 classrooms and course rooms, specialist rooms for fine arts, handicrafts, nursing, music, textiles, natural sciences and IT. Teachers' offices are located in the administration area in one wing of the transverse building. There are also teaching materials and preparation rooms, as well as sanitary facilities and technical rooms.

    All classrooms and specialist rooms are equipped with the latest technology and a digital whiteboard.

    Year of execution and completion: autumn 2021 to autumn 2024

    Energetic measures:

    • Curtain wall façade with 20 cm mineral wool insulation, rear ventilation and façade panels
    • Windows: Thermal insulation triple glazing
    • External shading of the entire window
    • Equipping the building with decentralised ventilation units
    • Heat generation through heat pumps
    • Photovoltaic system on both flat roofs
    • System on longitudinal structure: 35 kWpeak
    • System on transverse structure: approx. 40 kWpeak


    Accessibility:
    The new building is barrier-free, with all entrances at ground level. A lift has also been installed and a disabled toilet has been built.

    Costs: The construction costs (KGR 200 - KGR 700) for the building project, including engineering services, totalled approx. 13.7 million euros.